Max Gunther Center for Amazon Research

Mission

forest-steward-max-gunther.jpg
Max Gunther Doering

The MGC building in 2008 (approx.)

Current state of the building (May 2019)

mgc_exterior_view_img_20190516_112654_v003.jpg Fig.: The abandoned MGC building.

Today the center is close to deterioration. It is high time to save the building! It is still feasible to refurbish it.

The roof is still intact, as well as the wooden pillars suporting it.

Some of the wooden pillars supporting the floor are rotten and have to be replaced as well as some elements of the floor joist.

The front wall is missing.

Measures to be taken

  1. replace the wooden vertical beams supporting the platform with concrete piles.