===== Mission ===== | ===== Mission ===== | ||
- | | {{ : | + | | {{ : |
| Max Gunther Doering | | Max Gunther Doering | ||
+ | ===== The MGC building in 2008 (approx.) ===== | ||
+ | {{: | ||
+ | //Fig.: The MGC building with porch in approx. 2008.// | ||
- | ===== State of the building (May 2019) ====== | ||
- | {{ : | + | ===== Current state of the building (May 2019) ====== |
- | //Fig.: The abandoned MGC building.// | + | |
+ | {{: | ||
+ | //Fig.: The abandoned MGC building | ||
Today the center is close to deterioration. It is high time to save the building! It is still feasible to refurbish it. | Today the center is close to deterioration. It is high time to save the building! It is still feasible to refurbish it. | ||
Line 18: | Line 22: | ||
The roof is still intact, as well as the wooden pillars suporting it. | The roof is still intact, as well as the wooden pillars suporting it. | ||
- | Some of the wooden pillars supporting the floor are rotten and have to be replaced. | + | Some of the wooden pillars supporting the floor are rotten and have to be replaced |
+ | |||
+ | The front wall is missing. | ||
===== Measures to be taken ===== | ===== Measures to be taken ===== | ||
- | - replace | + | - Replace |
+ | - Replace the rotten floor joists | ||
+ | - Waste disposal | ||
+ | - Construct a new front wall | ||
===== History ===== | ===== History ===== | ||